HOME ABOUT US PRODUCTS OUR CLIENT QUALITY WORK COMPLETED ENQUIRY CONTACT US
Welcome to Akona Infra
We are in the field of manufacturing of various types of Construction Machinery since august 1992. We have manufactured and supplied our products in various Government, Semi-Government and Private Sector, all over India and also exporting our products. Performance of our products is unmatched today, we are a brand name in the field of Manufacturing of all types of RMC Plants i.e. Concrete Batching & Mixing Plant.
Mohan Group consists of Following Registered Manufacturing Units:-
  1. AKONA INFRASTRUCTURE (P) LTD.
  2. AKONA ENGINEERING PVT. LTD.(GHAZIABAD & ROORKEE)
  3. Akona Pathwari Infrastructure Pvt. Ltd. (Noida)
  4. Mohan Engineering Pvt. Ltd.
Now, looking forward the demand of RMC (Ready Mix Concrete), we have started supplying RMC since 2007-08. For RMC, we have now developed an independent and separate unit as M/S AKONA INFRASTRUCTURE PVT. LTD. with sufficient Manpower and Machinery required. We have various ongoing and completed projects in Government, Semi- Government and Private Sector in all over India. All type of projects such as Group Housing, Commercial Complexes, Power Plants, Roads, Bridges, Dams etc. are either completed or in progress. A small list of projects in hand is enclosed along with. We execute RMC works as per client demand i. e. (i) Hiring of Machinery, (ii) Job Work on Machinery Basis and (iii) RMC with Machinery and Raw Material complete. We produce RMC as per design mix desired by the clients.
 
Latest News
Work of transformer oil filtration at vaitarna HPS (60 MW) and Surya HPS Estimated
Cost : 199,200
Rapair of Product pipeline.
Supply of Transformar Oil
Estimated Cost : 680,295
Rate contract for miscellaneous piping and other allied hot jobs at offsite area.
Estimated Cost : 7,198,872
Providing project management and supervision services on full time basis.
Estimated Cost : 140,000
Laying/Replacement of 50 Km of 100 mm NB welded flow lines from drilling wells, work over wells, water injection lines, formation water lines and gas artery line sin and around OILs operational.
Estimated Cost : 7,983,775

Piping jobs related to ibr during shutdown in different units of mathura refinery.
Estimated Cost : 1,317,872

Procurement of engine oil.
Supply of HSD (euro 5) to North Chennai Thermal Power Station
Hiring of Coring Services.
Hiring of one Explosive Van in good running condition including supply of Diesel & Lubricant by the Contractor for 24 hours use at Urimari Project.
Supply of waste Oil.
Empanelment Of Technical Consultants For Business Development Activities.
Hiring of services for various instrumentation works at offshore platforms Hiring of Engineering Consultant for Modification on 9 wellhead platforms for deployment of modular Rig.
List of Works Completed

Copyright © 2013 M/S AKONA INFRASTRUCTURE PVT. LTD. All Right Reserved.                           Website Designing By - Koncept Info Technologies
Follow Us :